Search

City of Fernandina Beach Web Portal

Planning Application Status

HDC2026-0008


Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

HDC2026-0008
HDC2026-0008
Historic District Council
HDC Pre-Application
File Closed
03/03/2026
his proposed project will be the second phase which is the continuation of the first phase for the Fernandina Beach Riverfront Resiliency Project just south of the boat ramp. The proposed project will consist of 2 phases. The first phase is the demolition of Brett's Waterway Cafe and the dredging of the debris, a new pier is to be constructed to be more in alignment with Center Street with a single entrance to the marina, and improve site views, while the construction of the new pier is occurring the existing pier will be demolished. Also the proposed project will consist of a new concrete bulkhead and wooden boardwalk constructed over the water to replace the existing boardwalk, and failing bulkhead under Brett's. The new bulkhead appearance and finish to match phase one of the Fernandina Beach Riverfront Resiliency Project which will be a concrete coquina finish with recess amber lighting that is Florida Fish and Wildlife Conservation Commission approved. The new pier location will improve main access from Historic Center Street and improve sight lines from Front Street to the Amelia Waterway and the marina. The removal of existing piles including debris that have collapsed in water under Brett's, will overall improve waterway flow. The proposed materials for the pier will be a hybrid system in design and will consist of composite piles (allows for better waterflow and resiliency), pressure treated heavy timber beams and joists, with composite decking (resiliency minimizes the need to replacing decking Annually). The pier railing will be a copy of phase 1, which consists of pressure treated wood guard rails with stainless steel cable infill. Note the pier railings will also include lighting to match recessed lighting used in phase 1 with amber lights, that is Florida Fish and Wildlife Conservation Commission approved. The proposed materials for the boardwalk will be a hybrid system in design and will consist of composite piles (allows for better waterflow and resiliency), pressure treated heavy timber beams and joists, with composite decking (resiliency minimizes the need to replacing decking Annually). The pier railing will be a copy of phase 1, which consists of pressure treated wood guard rails with stainless steel cable infill. The existing structures that Brett's Waterway Cafe was built on were once of a historic nature. Numerous reports on the structural integrity have been completed and submitted over the years, addressing concerns regarding life safety. This included a detail analysis of the structure and the state of

Please right click on this link to consult the TRC/Board Meeting Calendar + Submission Deadlines and insert your chosen date below.

01/02/2026

Please right click on this link to consult the TRC/Board Meeting Calendar + Submission Deadlines and insert your chosen date below.

01/02/2026

Locations

Application Types

HDC Pre-Application

Staff
Closed

Fees

There are no fees for this planning application, or you are not authorized to view them.

Hearings

Title Location Date Time
HDC Meeting 204 Ash Street Fernandina Beach, FL 32034 03/20/2026
Complete

Conditions

There are no conditions for this planning application, or you are not authorized to view them.

Related Permit & Planning Applications

There are no related items for this planning application.

Meeting Requests

There are no meeting requests for this planning application.

Documents & Images

No documents are currently available for viewing.

Government Websites by CivicPlus®